SAIL, Bhilai Steel Plant, Bhilai
Date : 30/3/1996
Description : Erecton, testing, painting & commissioning of exhauster along with its auxiliaries and pipe line in coke oven battery -10 complexes BSP
Quantity : 400 MT
Status : Completed
Date : 18/7/1996
Description : Executing the job of starting up of rod screen location at SP-2 BSP, Bhilai and its operation & maintenance.
Quantity : 400 MT
Status : Completed
Date : 5/9/1998
Description : Transportation, erection, testing, commissioning and insulation of technological pipe lines and ventilation ducting of furnace crown cooling system in THF-1
Quantity : PKG.
Status : Completed
Date : 15/07/2002
Description : Up-gradation of Nitrogen network Phase-I dismantling of existing facility and erection of new equipments and pipeline work.
Quantity : 800 MT
Status : Completed
Date : 28/5/2005
Description : Erection, testing & commissioning of 05 nos. Oxygen / Nitrogen turbo compressors of capacity-12500 NM3 and pressure 31 BAR, make Kazan (Russia) with CS & SS pipeline work.
Quantity : 05 NOS.
Status : Completed
Date : 12/8/2005
Description : Fabrication, erection and testing of CS pipeline for oxygen at pressure 31 bar from OP-II to SMS-I. Fabrication, erection and testing of oxygen PRMS (CS, SS & Copper Piping) for BF – 2 & 5.
Quantity : 4000 RM
Status : Completed
Date : 10/9/2005
Description : Revamping and restoration of gas cleaning plant for blast furnace.
Quantity : PKG
Status : Completed
Date : 15/10/2008
Description : Upgradation of nitrogen network (phase-II) of Bhilai Steel Plant – design & engineering work, civil work, structural work, supply of plant & equipment and utilities, erection and commissioning on turnkey basis.
Quantity : 900 MT
Status : Completed
Date : 13/10/2009
Description : Relocation of mechanical repair shop & quenching car repair shop of CO&CCD including foundation design and civil work and erection of plant & equipment.
Quantity : 700 MT
Status : Completed
Date : 5/6/2010
Description : New cold sinter screening system under modernisation of sinter plant-II of Bhilai Steel Plant (pkg-021a) – civil work, building structural work, technological structural work and erection of plant & equipment and utilities etc.
Quantity : 1500 MT
Status : Completed
Date : 30/7/2010
Description : Installation of online eddy current testing machine and optical visual inspection system supplied by M/S NDT Technologies, Canada at rail mill including foundation design and civil work
Quantity : 01 NO.
Status : Completed
Date : 22/2/2013
Description : Infrastructure facilities for 2 x 1250 TPD Oxygen plant – provision of water facilities (works package) in BSP, Bhilai erections of mechanical plant & equipment and civil work
Quantity :4000 RM
Status : Completed
Date : 6/2/2016
Description : Supply and erection of storage tank as per ts no. MEC/S/9101/02/40/10/24/077-01D.(PKG 77-01D)
Quantity : 600 MT
Status : Completed
Date : 10/10/2017
Description : Dismantling, erection, leveling & alignment of mill stand (roughing & finishing stand of p. Mill) housing liners, roll chocks liners & other enabling jobs for mill housing laser survey.
Quantity : LOT
Status : Completed
Date : 26/3/2018
Description : Dismantling, revisioning and assembly of work roll sets.
Quantity : LOT
Status : Completed
Date : 7/5/2018
Description : Emergency laying of pipeline for the new balancing of sustained pressure in pipelines for the water- supply to BF s from PH#2.(4270007078).
Quantity : LOT
Status : Completed
Date : 7/5/2018
Description : Emergency laying of pipeline for the new balancing of sustained pressure in pipelines for the water- supply to BF s from PH#2.(4270007078).
Quantity : LOT
Status : Completed
Date : 9/10/2018
Description : Online chemical cleaning of SS & CS pipeline for oxygen service for SRU of SMS III.
Quantity : 5640 IM
Status : Completed
Date : 14/6/2019
Description : Providing skilled services for the running maintenance of hydraulic network of plate mill.
Quantity : LOT
Status : Completed
Date : 24/7/2019
Description : Providing operational assistance/ enabling services of the reheating furnace section of plate mill.
Quantity : LOT
Status : Completed
Date : 13/8/2019
Description : Repair jobs of Sinter cooler and MND inside repair of SP-III.
Quantity : LOT
Status : Completed
Date : 9/4/2019
Description : Revisioning of work roll sets in plate mill of Bhilai steel plant.
Quantity : LOT
Status : Completed
Date : 22/1/2020
Description : Providing operational assistance/ enabling services of the reheating furnace section of plate mill.
Quantity : LOT
Status : Completed
Date : 3/7/2020
Description : Routine breakdown (excluding capital repair) mechanical maintenance of all conveyors and auxiliary equipment of Sinter transportation route, blast furnace 1 to 8 return Sinter route, CSP-4 return coke route, emergency bunker and RCL area lad equipment and belts.
Quantity : LOT
Status : Completed
Date : 18/4/2020
Description : Providing skilled services for the running maintenance of hydraulic network of plate mill.
Quantity : LOT
Status : Completed
Date : 19/5/2020
Description : Laying of new (3rd) line for BF # 1 to 6 furnace cooling water circuit from PH#2 on LTE basis.
Quantity : LOT
Status : In Progress
Date : 27/5/2020
Description : Work package for stoves (Pkg. No. WP-01) (balance supply & erection work of mechanical &utilities work of BF -4 stoves ).
Quantity : LOT
Status : In Progress
Date : 6/6/2020
Description : Capital repair jobs of Sinter cooler and MND inside repair of SP-III, MC- 1.
Quantity : LOT
Status : Completed
Date : 8/1/2020
Description : Providing operational assistance/ enabling services of the reheating furnace section of plate mill.
Quantity : LOT
Status : Completed
Date : 16/9/2020
Description : Installation of oxygen and compressed air pipelines along with valves (Pkg-075c) under 7 mt modernization and expansion of BSP.
Quantity : LOT
Status : Completed
Date : 17/10/2020
Description : Providing skilled services for the running maintenance of hydraulic network of plate mill.
Quantity : LOT
Status : Completed
Date : 25/12/2020
Description : Capital repair of Sinter cooler and it associated equipment MC-2, SP -3.
Quantity : LOT
Status : Completed
Date : 23/1/2021
Description : Providing operational assistance/ enabling services of the reheating furnace section of plate mill.
Quantity : LOT
Status : Completed
Date : 3/2/2021
Description : BF #7 CR: GCP, booster & OHT supply lines, primary & OHT supply & GCP return lines, auxiliary & sump pipelines replacement/ repair jobs.
Quantity : LOT
Status : In Progress
Date : 18/3/2021
Description : Routine breakdown (excluding capital repair) mechanical maintenance of all conveyors and auxiliary equipment of Sinter transportation route, blast furnace 1 to 8 return Sinter route, CSP-4 return coke route, emergency bunker and RCL area lad equipments and belts.
Quantity : LOT
Status : Completed
Date : 4/10/2021
Description : Capital repair jobs of Sinter cooler area of MC-1, SP-3.
Quantity : LOT
Status : Completed
Date : 17/6/2021
Description : Routine breakdown (excluding capital repair) mechanical maintenance of all conveyors and auxiliary equipment of Sinter transportation route, blast furnace 1 to 8 return Sinter route, CSP-4 return coke route, emergency bunker and RCL area lad equipment and belts.
Quantity : LOT
Status : Completed
Date : 25/6/2021
Description : Laying of oxygen pipelines from SMS- I to HRD Covid Centre at Bhilai Steel Plant
Quantity : LOT
Status : Completed
Date : 20/9/2021
Description : Dismantling , erection, leveling of mill stand (roughing & finishing stand of plate mill) housing liners, roll chocks liners & other enabling jobs for mill housing audit & survey.
Quantity : LOT
Status : In Progress
Date : 24/9/2021
Description : Replacement of rah baskets& other associated jobs and complete economizer coils (size 51.0×3.60mm, 30 nos.) in HP Boiler#6 of power & blowing station of Bhilai Steel Plant.
Quantity : LOT
Status : In Progress
Date : 29/11/2021
Description : Routine breakdown (excluding capital repair) mechanical maintenance of all conveyors and auxiliary equipment of Sinter transportation route, blast furnace 1 to 8 return Sinter route, CSP-4 return coke route, emergency bunker and RCL area lad equipment an
Quantity : LOT
Status : In Progress